How to Apply for a New Electricity Connection in Pakistan (ENC Guide)
New domestic and commercial electricity connections go through PITC's online ENC portal. Here's what the process actually involves, start to finish.
Before you apply
A new electricity connection is applied for at the sub-division office covering the property's address. Which company that is follows the address, not preference — each distribution company holds an exclusive NEPRA licence for its territory.
The most consequential decision at this stage is the sanctioned load you apply for. It determines whether you get a single-phase or three-phase connection, what the demand notice will cost, and — importantly for anyone considering rooftop solar later — whether you will be eligible for net metering without a further upgrade application.
Think about solar before you choose the load
Net metering generally requires a three-phase connection and a sanctioned load at least as large as the system you intend to install. Upgrading later is a separate application with its own cost and delay, so it is worth deciding now rather than twice.
What you will need
- CNIC of the applicant.
- Proof of ownership or a tenancy agreement for the property.
- A recent bill from a neighbouring connection, which the office uses to identify the feeder and sub-division.
- The completed application form for the connection category you want — domestic, commercial, industrial or agricultural.
- A test report from a licensed electrician confirming the internal wiring meets the required standard.
Apply in the correct category from the start
A domestic property connected on a commercial tariff is billed at higher rates, and changing category afterwards is slower than getting it right initially. Confirm the category on the application before signing.
How the process runs
- 1
Submit the application
At the sub-division office covering the address. Get a receipt or tracking number — it is what you will reference if the application stalls.
- 2
Site inspection
The company inspects the premises, verifies the wiring test report and confirms what infrastructure is needed to serve the connection.
- 3
Demand notice
You receive a notice setting out the cost: security deposit, meter cost and any line or transformer work required. The amount varies enormously depending on whether the property is near existing infrastructure.
- 4
Pay the demand notice
Payment is made through the designated bank rather than at the office. Keep the receipt.
- 5
Meter installation and energisation
The meter is fitted and the connection energised. Your reference number is issued at this point.
- 6
First bill
Expect several weeks before the first bill is generated, since it follows the normal monthly cycle rather than arriving immediately.
Under NEPRA's performance standards, distribution companies are obliged to provide the large majority of new connections within a prescribed timeframe, and the regulator publishes how each company performs against that obligation. Persistent delay beyond the standard is a legitimate basis for escalation rather than something you simply have to accept.
If it stalls
- 1
Ask in writing what stage it is at
A verbal enquiry leaves no record. A written one, referencing your tracking number, does.
- 2
Escalate within the company
Above the sub-division office sits the division and then the circle. Each level can be approached.
- 3
Pakistan Citizen Portal
Effective for connection delays because it applies a monitored deadline that the office cannot quietly ignore.
- 4
NEPRA
New connection timeframes are a performance standard the regulator enforces, which makes this a stronger complaint than it might appear.
Questions
How much does a new connection cost?
It varies widely. The security deposit and meter cost are relatively predictable; what moves the total is whether new line, poles or a transformer are needed to reach the property. A site far from existing infrastructure costs considerably more.
Can I choose my distribution company?
No. Each company holds an exclusive licence for its geographic territory, so the address determines the supplier.
Is the security deposit refundable?
It is held against the account and is refundable when the connection is permanently closed and all dues cleared. Keep the receipt — reclaiming it years later without one is difficult.
Can I use a neighbour's connection meanwhile?
Drawing supply from another connection is not a legitimate arrangement and risks a detection bill against whichever connection the consumption is recorded on. It is not worth the exposure.
Check your bill now
Related guides
- The Cross Subsidy Program: Are You Eligible for a Protected Tariff?
- How to File an Electricity Complaint in Pakistan (DISCO, PMDU & NEPRA)
- How to Check Your Electricity Bill Online in Pakistan (2026)