K-Electric New Electricity Connection
A new residential or commercial meter in Karachi and adjoining areas of Sindh & Balochistan coast is applied for directly with K-Electric. Here are the documents you need and every step to the meter.
Helpline 118Step by step
- 1
Estimate the cost
Use K-Electric's new connection cost calculator for your load and category.
- 2
Apply to K-Electric
Submit the application with your documents through K-Electric's customer channels or the nearest IBC (Integrated Business Centre).
- 3
Site survey and demand notice
K-Electric surveys the site and issues a demand notice with the cost of the connection.
- 4
Pay and get the meter installed
Pay the demand notice at a bank; the meter is installed and your account number issued.
Documents required
- Copy of the applicant's CNIC
- Proof of ownership or tenancy (registry, fard, allotment letter, or rent agreement with the owner's NOC)
- Wiring test report signed by a licensed electrical contractor
- A recent paid bill of the nearest neighbouring connection (for locating the pole and feeder)
- Load details: the appliances you will connect, for the sanctioned load
Beware of agents
Apply and pay the demand notice only through the official portal and a bank. Never send money to a personal account to 'speed up' a connection.
Frequently asked questions
How long does a new K-Electric meter take?
After the demand notice is paid, NEPRA's performance standards oblige the company to energise the connection within a set period; if it is late, file a complaint.
How much does a new connection cost?
The fee depends on the load, the tariff category and the distance to the nearest pole, and is stated on your demand notice.
Can a tenant apply?
Yes, with a rent agreement and the owner's NOC in place of ownership documents.